Low Price Rj-90 Heat Treatment Muffle Melting Furnace for Binding Wire Screw/Binding
Description
Basic Info
Type | Stainless Steel Heating Equipment |
Certification | CE |
Structure | Well Type |
Brand | Candid |
Power Supply | 380/415/440/220V |
Power | 90kw |
After-Sales Service Provided | Engineers Available to Service Machinery Overseas |
Max Working Temperature | 750 |
Capacity | 3ton/Day |
Fuel | Natural Gas, LPG, Electricity |
Heating Temperature | 650-700 °c |
Transport Package | in Nude or Wooden Case |
Specification | 2212*2212*2189mm |
Trademark | CANDID |
Origin | China |
HS Code | 8514300090 |
Production Capacity | 3ton/Day |
Product Description
High Capacity Well Type Electric Annealing Furnace Induction Heater Oven supplier for screw/binding wire
Main Technical Parameter
1.1. Model: RJ-90-9 (2 tubes)
Power supply: Electricity / Natural Gas / LPG
Capacity: 2.0T/8hours
Power: 70kw
1.2. Furnace Body
5mm Q235 board furnace shell
Lightweight firebrick Internal liner
Holocellulose alumina silicate keeping temperature
Heating element: Cr20Ni80
1.3. Furnace Tube
Thickness: 8mm, Dia.: 800mm, high: 1200mm
Material: Stainless Steel
1.4. Working Process of Annealing Wire:
a. Two hours heating to 650°C-700°C
b. Keeping Temperature 650°C-700°Cfor 2 hours
c. Keep the tube in the furnace, cooling for 4 hours till the temperature is about 300°C
d. Taking out of the tube put another one in
e. When the tube temperature is below 170°C, take the wire out
FAQ
1. What is your machine type?
A: We offer Electricity annealing furnace and gas annealing furnace.2. what is the heating temperature when it work?
A: 650-700ºC3. What is the capacity for your machine?
A: We have different capacity which according to client's request, the most common type is 3 ton/24hours.4. What is the sea port for delivery.A: The nearest sea port from our factory is Shanghai port5. What is the guarantee?
A: 12 months after commissioning or 18months after shipment. Whichever first is in valid. (it is excluding wear parts. Shipping cost for parts to be replaced during warranty period has to be borne by the customer.)6. How to install chain link fence machine?
A: 1 technicians and 1 interpreter will be assigned to coordinate installation, commissioning and training, for the maximum duration of 15 working days your side will supply the air return tickets, food, accommodation(hotel and one day three meals), transportation, communication, insurance , tax ( if have) for the technicians and the interpreter. USD120.00/day/person working fee will be paid to them.
Our Contact